• SME MS94-199
Provide PDF Format

Learn More

SME MS94-199

  • Sequencing Single-Gripper Gantry Robots In Tightly-Coupled Automated Serial Production
  • standard by Society of Manufacturing Engineers, 06/01/1994
  • Publisher: SME

$9.00$18.00


THIS PAPER DEALS WITH THE PROBLEM OF SCHEDULING SINGLE-GLRIPPER GANTRY ROBOTS IN A TIGHTLY-COUPLED AUTOMATED SERIAL PRODUCTION LINE WITH DETERMINISTIC PROCESSING TIME. AN OPTIMAL SCHEDULE IS PRESENTED FIRST BY ANALYZING THE CYCLE TIME FORMULA FOR TWO- AND THREE-WORKSTATION (m=2, AND 3) PRODUCTION LINES. THEN THE RESULT IS EXTENDED TO THE PROBLEM OF SCHEDULING A PRODUCTION LINE WITH m>3 WORKSTATIONS AND AN OPTIMAL SCHEDULE IS DEVELOPED. THIS STUDY PROVIDED VALUABLE INSIGHTS FOR THE DESIGN AND SCHEDULINE OF PRODUCTION SYSTEMS USING SIMILAR MATERIAL HANDLING MECHANISMS.

Related Products

SME MS920333

SME MS920333

Implementation Of Integrated 3d Cad/Cam/Cae/Cnc On Massively Parallel Computers..

$9.00 $18.00

SME MSR93001

SME MSR93001

The Effectiveness Of Cnc Machines As Training Stations For College Prepared, Entry-Level Manufacturi..

$9.00 $18.00

SME MS920327

SME MS920327

Breaking The Work-Wait Cycle..

$9.00 $18.00

SME EM910254

SME EM910254

Ceramic Metal Forming Tools..

$9.00 $18.00