• SME MS98-184
Provide PDF Format

Learn More

SME MS98-184

  • Using Single Significant Factor In Due-Date Assignment Rules For Dynamic Job Shops
  • standard by Society of Manufacturing Engineers, 11/01/1998
  • Publisher: SME

$9.00$18.00


Many studies have shown that the choice of dispatching rule and the choice of due-date assignment rule for dynamic job shops have significant interaction effects on performance and the decisions should be considered collectively. However, most due-date assignment rules are designed to be applied on all production systems regardless of which dispatching rule is used to sequence jobs. This simulation study of a dynamic job shop demonstrates methods of developing due-date assignment rules under various dispatching rules that have achieved statistically significant improvement over the other existing due-date rules in most of the performance measures used.

Related Products

SME EM94-109

SME EM94-109

Invar--Truths And Rumors..

$9.00 $18.00

SME MS910297

SME MS910297

X Window Interface For An Ibm Scara Robot..

$9.00 $18.00

SME MS900141

SME MS900141

Nc Programming--The Next Generation..

$9.00 $18.00

SME FC95-235

SME FC95-235

Quick And Easy--Conversions To Waterbase In An Electrostatic Disk System..

$9.00 $18.00