• SME TE910144
Provide PDF Format

Learn More

SME TE910144

  • Quick Change Tooling For Today...And Tomorrow
  • standard by Society of Manufacturing Engineers, 06/01/1991
  • Publisher: SME

$9.00$18.00


MACHINE TOOL PRODUCTIVITY IS GREATLY ENHANCED BY SHARPLY REDUCING SETUP TIME FOR WORKHOLDING AND TOOLING. SIGNIFICANT TIME SAVINGS CAN BE ACHIEVED IN SHORT, MEDIUM, AND LONG-RANGE PRODUCTION RUNS WITH THE USE OF PRESET, OFF-LINE TOOLING THAT REDUCES TRAIL CUTS, SCRAP PARTS, AND ASSURES BLUEPRINT ACCURACY. NOW, THERE ARE IN-PLACE QUICK CHANGE TOOLING SYSTEMS AVAILABLE FOR THE COMPLEX MANUFACTURING REQUIREMENTS OF TODAY AND IN THE FUTURE. BOTH TURNING AND GRINDING CASE HISTORIES--AND THE RESULTS ACHIEVED--DETAIL INCREASED MANUFACTURING UPTIME, PRECISION REPEATABILITY TOLERANCES TO .0001 IN. (0.003MM), AND REDUCED NONPRODUCTIVE DOWNTIME.

Related Products

SME CM930414

SME CM930414

Heat Treatment Of Gears By Gas Carburizing..

$9.00 $18.00

SME ER96-212

SME ER96-212

Implementing Industrial Quality Practices Into Manufacturing Education..

$9.00 $18.00

SME MS94-243

SME MS94-243

Lightweight, Multi-Purpose Two Roll Gripper For Part Manipulation..

$9.00 $18.00

SME ER96-236

SME ER96-236

An Interdisciplinary Laboratory For Manufacturing Education..

$9.00 $18.00