• SME TE94-251
Provide PDF Format

Learn More

SME TE94-251

  • Catching Up And Holding On
  • standard by Society of Manufacturing Engineers, 06/01/1994
  • Publisher: SME

$9.00$18.00


A METHODOLOGY FOR THE ECONOMICAL DESIGN OF WORKHOLDING SYSTEMS IS PRESENTED. A BACKGROUND IS DEVELOPED BY COMPARING THE GENERAL STATE OF THE ART IN WORKHOLDING TO THAT OF THE EQUIPMENT AND PROCESSES TO WHICH IT IS APPLIED AND BY REVIEWING FUNDAMENTAL PRINCIPLES. ALTERNATIVE WORKHOLDING MEANS ARE EXAMINED, AND WORKHOLDING TECHNOLOGY IS CATAGORIZED INTO FOUR GENERAL LEVELS. EXAMPLES OF THE DESIGN METHODOLOGY, IN BOTH METALCUTTING AND MULTI-PURPOSE APPLICATIONS, ARE GIVEN.

Related Products

SME MS900328

SME MS900328

Treating Metalworking Coolants--Ultrafiltration And Reverse Osmosis..

$9.00 $18.00

SME ER96-254

SME ER96-254

Executive Ms In Manufacturing: A New Program For Practicing Engineers..

$9.00 $18.00

SME IQ920214

SME IQ920214

Design For Logistics--The New Frontier..

$9.00 $18.00

SME AD910393

SME AD910393

The Technology Of Medical Device Adhesives..

$9.00 $18.00