• SSPC QP 7
Provide PDF Format

Learn More

SSPC QP 7

  • Procedure for Evaluating Painting Contractors with Limited Industrial Work Experience (Qualification Procedure No. 7)
  • standard by Society for Protective Coatings, 04/09/2014
  • Publisher: SSPC

$13.00$25.00


This procedure establishes criteria for preliminary qualification of contractors who intend to apply for certification to an industrial or architectural/commercial coating contractor certification program but have less than 12 months experience (or no experience) in field application of industrial or architectural/commercial protective coatings. This procedure does not address preliminary qualification of contractors whose coating operations are conducted exclusively at a contractor's fixed facility (i.e., shop painting).

Related Products

SSPC Guide 18

SSPC Guide 18

Specifier's Guide for Determining Containment Class and Environmental Monitoring Strategies for Lead..

$13.00 $25.00

SSPC PS 4.04

SSPC PS 4.04

Four-Coat White or Colored Vinyl Painting System (For Fresh Water, Chemical, and Corrosive Atmospher..

$13.00 $25.00

SSPC TU 6

SSPC TU 6

Chemical Stripping of Organic Coatings From Steel Structures (Includes 2004 Revisions)..

$13.00 $25.00

SSPC SP 16

SSPC SP 16

Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-Ferrous ..

$13.00 $25.00