• SSPC QP 7
Provide PDF Format

Learn More

SSPC QP 7

  • Procedure for Evaluating Painting Contractors with Limited Industrial Work Experience (Qualification Procedure No. 7)
  • standard by Society for Protective Coatings, 04/09/2014
  • Publisher: SSPC

$13.00$25.00


This procedure establishes criteria for preliminary qualification of contractors who intend to apply for certification to an industrial or architectural/commercial coating contractor certification program but have less than 12 months experience (or no experience) in field application of industrial or architectural/commercial protective coatings. This procedure does not address preliminary qualification of contractors whose coating operations are conducted exclusively at a contractor's fixed facility (i.e., shop painting).

Related Products

SSPC PS 12.01

SSPC PS 12.01

One Coat Zinc-Rich Painting System (Includes 2004 Revisions)..

$13.00 $25.00

SSPC TU 8

SSPC TU 8

The Use of Isocyanate-Containing Paints as Industrial Maintenance Coatings (Includes 2004 Revisions)..

$13.00 $25.00

SSPC SP 12/NACE No. 5

SSPC SP 12/NACE No. 5

Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating..

$13.00 $25.00

SSPC SP COM

SSPC SP COM

Surface Preparation Commentary for Metal Substrates..

$13.00 $25.00